Skip to content
TERESAKOK
Menu
  • About
  • Contact
Menu

Provisions made for aerobridges at KLIA2, Dewan Rakyat told

Posted on Tuesday, 18-10-2011 by -ec-

I had issued a statement previously, Aerobridges at KLIA2 are a must to allow for the mobility-impaired.

http://www.bernama.com.my/bernama/v5/newsindex.php?id=620378

Provisions made for aerobridges at KLIA2, Dewan Rakyat told

KUALA LUMPUR, Oct 17 (Bernama) — Malaysia Airports Holdings Berhad (MAHB) has made provisions for the installation of aerobridges at KL International Airport 2 (KLIA2), the new low-cost carrier terminal, if the airlines want to make use of them, the Dewan Rakyat was told today.

Deputy Transport Minister Jelaing Mersat said the proposal to build aerobridges at KLIA2 was still under consideration.

“Nevertheless, the government views with concern public opinion on the matter and has conveyed to MAHB the views of the physically challenged, the Malaysian Association of Tour and Travel Agents (Matta) and the Board of Airline Representatives on the need to build the aerobridges,” he said.

He was replying to a question from Teresa Kok Suh Sim (DAP-Seputeh) on whether approval had been given for the building of aerobridges at KLIA2 and for MAHB to raise the airport fees.

Jelaing said the ministry would only allow MAHB to raise fees commensurate with the services and facilities provided for passengers at an airport.

MAHB has decided not to install aerobridges in KLIA2 after considering budget carrier AirAsia’s decision not to use them, citing cost factors.

Despite that, MAHB said the new terminal would be built to accommodate the installation of aerobridges should it be required in the future.

About

Teresa Kok

About Teresa

Teresa Kok (郭素沁) is Seputeh's MP and DAP Vice-chairman. Born and bred in Kuala Lumpur, Teresa is a second-generation Malaysian of Chinese descent. n the 2008-2013 term she was Selangor Senior State Executive Councillor for Investment, Industry and Trade and State Assemblyperson for Kinrara.

Learn More

Recent Articles

  • 郭素沁:雪州伊党养猪课题立场矛盾,玩弄种族政治
  • Contradictory Statements by Selangor PAS Leaders on Pig Farming Show Political Opportunism
  • PENDIRIAN BERCANGGAH PEMIMPIN PAS SELANGOR BUKTI MEREKA HANYA MAHU MEMPOLITIKKAN ISU PENTERNAKAN BABI, BUKAN MENAWARKAN PENYELESAIAN DASAR
  • 政府受促掌握我国生物柴油的真实数据 ,以免作出提升生物柴油设施的错误预算
  • MTEN and the Government Media Team Urged to Obtain Accurate Figures and Facts on Biodiesel Supply and Usage in Malaysia to Avoid Miscalculations in Development Expenditure for Biodiesel Blending Depots
  • MTEN dan Team Media Kerajaan digesa Mendapat Nombor dan Fakta Berkenan Pembekalan dan Penggunaan Biodiesel di Malaysia Yang Sebenar Supaya Kerajaan Tidak Membuat Kesilapan Dari Segi Pengiraan Perbelanjaan Pembangunan Kelengkapan Depoh Pengadunan Biodiesel
  • [YouTube] Ucapan Kamar Khas Parlimen: Apakah Usaha Promosi Produk Komoditi Hiliran Dalam Tahun Melawat Malaysia 2026? (2 Mac 2026)
  • APAKAH USAHA PROMOSI PRODUK KOMODITI HILIRAN DALAM TAHUN MELAWAT MALAYSIA 2026 (2 Mac 2026)
  • B20生物柴油现在比纯柴油便宜,郭素沁促政府加速建设生物柴油储存库
  • BIODIESEL B20 KINI LEBIH MURAH DARIPADA DIESEL TULEN. KERAJAAN DIGESA MEMPERCEPATKAN NAIK TARAF DEPOT BAGI MEMPERLUAS PELAKSANAAN B20 UNTUK MENANGANI KENAIKAN HARGA BAHAN API.
  • BIODIESEL B20 IS CHEAPER THAN PURE DIESEL NOW. GOVERNMENT IS URGED TO FAST-TRACK CRITICAL DEPOT UPGRADES IN ORDER TO ACCELERATE B20 BIODIESEL ROLLOUT TO MITIGATE SURGING FUEL COSTS
  • 郭素沁促政府加速落实B20生物柴油政策;重启油库建设缓解燃油涨价压力
  • KERAJAAN DIGESA MEMPERCEPATKAN PELAKSANAAN BIODIESEL B20 DENGAN SEGERA MENGHIDUPKAN SEMULA PEMBINAAN DEPOT BAGI MENANGANI KRISIS HARGA BAHAN API
  • GOVERNMENT IS URGED TO ACCELERATE B20 BIODIESEL ROLLOUT BY URGENTLY REVIVING DEPOT CONSTRUCTION TO COUNTER FUEL PRICE CRISIS
  • 郭素沁:设立皇委会是检验昌明政府透明承诺的试金石

Article Archives

© 2026 TERESAKOK | Powered by Minimalist Blog WordPress Theme