Skip to content
TERESAKOK
Menu
  • About
  • Contact
Menu

Protest against high-tension cables with residents of Taman Halimahton

Posted on Monday, 11-04-2011Monday, 11-04-2011 by -ec-

TNB urged to run cables underground

2011/04/07
By Halim Said
[email protected]

KUALA LUMPUR: Why not run the high-tension cables underground? This is the question residents and business operators in Taman Halimahton, Jalan Klang Lama, want answered over the issue of the Tenaga Nasional Bhd (TNB) high-tension cable pylons that are running alongside their homes. The pylons were erected by TNB three years ago.

Residents are irked by TNB’s announcement that this stretch of pylons will remain above ground while the extension grids across the road to Taman Bukit Desa will go underground.

Streets reported in 2009 that Taman Bukit Desa residents had requested that the high-tension cable pylons, which run just 100m from their houses, to go below ground as they feared the high voltage current running there would pose a health risk.

Among the health hazards they claimed, based on a result from an international study, was that exposure to electromagnetic fields radiation could bring about serious illnesses such as leukaemia and cancer.

Taman Halimahton resident association secretary Ng Poh Keat (picture), 51, said residents and business operators had been informed by TNB that the existing pylons near a nursery next to the residential area will remain above ground.

“If Taman Bukit Desa residents can argue that there are potential health hazards from EMF radiation, then we can, too,” he said.

Ng said an appeal letter was sent to TNB last month for it to reconsider aligning the high-tension cables underground.

Meanwhile, the residents’ plea received the attention of Seputeh Member of Parliament Teresa Kok.

“TNB must review this seriously and not apply double-standards in meeting the residents demands. I hope TNB will have a dialogue with the affected residents soon,” she said.
The high-tension cables are part of the Klang Valley power grid upgrade by TNB which involves converting the existing 33kV power line to a 275kV power line to supply electricity to the southern part of the Klang Valley.

 

2 thoughts on “Protest against high-tension cables with residents of Taman Halimahton”

  1. AH LIM says:
    Monday, 11-04-2011 at 22: 55.15

    This TNB action falls in line with 1Malaysia attitude. They do the plot and then places the dots to complete the graph. This is Bolehland.

    If cables run above ground, more pylon more money. Contract already awarded to manufacturers, need to take delivery mah.

    If cancel the contract, compensation can be even more – sound familiar??!!! The crooked one!

  2. Green Dragon says:
    Thursday, 14-04-2011 at 14: 29.31

    Underground high tension wire has all kind of problem including cost, easy sabotage.

Comments are closed.

About

Teresa Kok

About Teresa

Teresa Kok (郭素沁) is Seputeh's MP and DAP Vice-chairman. Born and bred in Kuala Lumpur, Teresa is a second-generation Malaysian of Chinese descent. n the 2008-2013 term she was Selangor Senior State Executive Councillor for Investment, Industry and Trade and State Assemblyperson for Kinrara.

Learn More

Recent Articles

  • 郭素沁:雪州伊党养猪课题立场矛盾,玩弄种族政治
  • Contradictory Statements by Selangor PAS Leaders on Pig Farming Show Political Opportunism
  • PENDIRIAN BERCANGGAH PEMIMPIN PAS SELANGOR BUKTI MEREKA HANYA MAHU MEMPOLITIKKAN ISU PENTERNAKAN BABI, BUKAN MENAWARKAN PENYELESAIAN DASAR
  • 政府受促掌握我国生物柴油的真实数据 ,以免作出提升生物柴油设施的错误预算
  • MTEN and the Government Media Team Urged to Obtain Accurate Figures and Facts on Biodiesel Supply and Usage in Malaysia to Avoid Miscalculations in Development Expenditure for Biodiesel Blending Depots
  • MTEN dan Team Media Kerajaan digesa Mendapat Nombor dan Fakta Berkenan Pembekalan dan Penggunaan Biodiesel di Malaysia Yang Sebenar Supaya Kerajaan Tidak Membuat Kesilapan Dari Segi Pengiraan Perbelanjaan Pembangunan Kelengkapan Depoh Pengadunan Biodiesel
  • [YouTube] Ucapan Kamar Khas Parlimen: Apakah Usaha Promosi Produk Komoditi Hiliran Dalam Tahun Melawat Malaysia 2026? (2 Mac 2026)
  • APAKAH USAHA PROMOSI PRODUK KOMODITI HILIRAN DALAM TAHUN MELAWAT MALAYSIA 2026 (2 Mac 2026)
  • B20生物柴油现在比纯柴油便宜,郭素沁促政府加速建设生物柴油储存库
  • BIODIESEL B20 KINI LEBIH MURAH DARIPADA DIESEL TULEN. KERAJAAN DIGESA MEMPERCEPATKAN NAIK TARAF DEPOT BAGI MEMPERLUAS PELAKSANAAN B20 UNTUK MENANGANI KENAIKAN HARGA BAHAN API.
  • BIODIESEL B20 IS CHEAPER THAN PURE DIESEL NOW. GOVERNMENT IS URGED TO FAST-TRACK CRITICAL DEPOT UPGRADES IN ORDER TO ACCELERATE B20 BIODIESEL ROLLOUT TO MITIGATE SURGING FUEL COSTS
  • 郭素沁促政府加速落实B20生物柴油政策;重启油库建设缓解燃油涨价压力
  • KERAJAAN DIGESA MEMPERCEPATKAN PELAKSANAAN BIODIESEL B20 DENGAN SEGERA MENGHIDUPKAN SEMULA PEMBINAAN DEPOT BAGI MENANGANI KRISIS HARGA BAHAN API
  • GOVERNMENT IS URGED TO ACCELERATE B20 BIODIESEL ROLLOUT BY URGENTLY REVIVING DEPOT CONSTRUCTION TO COUNTER FUEL PRICE CRISIS
  • 郭素沁:设立皇委会是检验昌明政府透明承诺的试金石

Article Archives

© 2026 TERESAKOK | Powered by Minimalist Blog WordPress Theme