Skip to content
TERESAKOK
Menu
  • About
  • Contact
Menu

KL mayor leaves condo challenge to courts; protest banners go missing

Posted on Thursday, 23-11-2017 by -ec-

KUALA LUMPUR, Nov 14 — Tan Sri Mohd Amin Nordin Abdul Aziz said he will let the courts decide the future of The Address, a new high-density residential development in Taman Desa being protested by existing residents.

This comes after 11 residents there filed a lawsuit against the Kuala Lumpur mayor to stop the new condominium project.

They filed for a judicial review of the planning permission for the project with the Kuala Lumpur High Court in March, on the grounds that proper procedures were not followed, among others.

The Star Online quoted the mayor as saying that the Kuala Lumpur City Hall (DBKL) would have to first wait for the court’s decision before taking any further action.

“The main entry and exit road will be able to support the development and only cause minimal traffic impact to the surrounding area.

“Based on the traffic impact assessment report, the developer is required to upgrade the road infrastructure,” he reportedly said.

“Among the upgrading works required include the Jalan Desa Bakti-Jalan Desa Utama junction, building a pedestrian walkway around the site and surrendering part of the land to the neighbouring school and condominium for road reserve.

“The developer is also required to ensure that nearby residents are informed on the project through a meeting with the residents and advertisements in Malay and English newspapers,” Mohd Amin added.

KY Khong, one of the 11 who sued, previously said the residents had no choice but to file the legal challenge after the mayor granted a planning permission for the project known as The Address.

He had said that the land for the Proposed Development has been gazetted as Tenaga Nasional Berhad (TNB) reserve land and not residential land, and that it was marked as for utilities, and not for development.

The 11 residents are from the three neighbouring condominiums directly affected by The Address project, namely 10-storey Tiara Faber which has 320 units, 13-storey Desa Eight (24 units), and 13-storey 1 Desa (104 units).

Separately, opponents of the new development project in Taman Desa claimed that their banners on the protest have been mysteriously removed.

“Residents were greeted on Monday, November 13, 2017 with a shock when three banners put up by residents to protest the proposed high density developments in the Taman Desa area (went missing),” said the Save Taman Desa group.

The group said that two of the banners had been put up near the entrance to Taman Desa from the Salak East — West Link and a stone’s throw away to Jalan Desa Bakti 2.

“News of the missing banners has spread quickly to the residents who are now even more furious. The case of these missing banners may just further galvanize the protest and gather further support.”
Read more at http://www.themalaymailonline.com/malaysia/article/kl-mayor-leaves-condo-challenge-to-courts-protest-banners-go-missing#ABc8dSLZ068ahgld.99

About

Teresa Kok

About Teresa

Teresa Kok (郭素沁) is Seputeh's MP and DAP Vice-chairman. Born and bred in Kuala Lumpur, Teresa is a second-generation Malaysian of Chinese descent. n the 2008-2013 term she was Selangor Senior State Executive Councillor for Investment, Industry and Trade and State Assemblyperson for Kinrara.

Learn More

Recent Articles

  • 政府受促掌握我国生物柴油的真实数据 ,以免作出提升生物柴油设施的错误预算
  • MTEN and the Government Media Team Urged to Obtain Accurate Figures and Facts on Biodiesel Supply and Usage in Malaysia to Avoid Miscalculations in Development Expenditure for Biodiesel Blending Depots
  • MTEN dan Team Media Kerajaan digesa Mendapat Nombor dan Fakta Berkenan Pembekalan dan Penggunaan Biodiesel di Malaysia Yang Sebenar Supaya Kerajaan Tidak Membuat Kesilapan Dari Segi Pengiraan Perbelanjaan Pembangunan Kelengkapan Depoh Pengadunan Biodiesel
  • [YouTube] Ucapan Kamar Khas Parlimen: Apakah Usaha Promosi Produk Komoditi Hiliran Dalam Tahun Melawat Malaysia 2026? (2 Mac 2026)
  • APAKAH USAHA PROMOSI PRODUK KOMODITI HILIRAN DALAM TAHUN MELAWAT MALAYSIA 2026 (2 Mac 2026)
  • B20生物柴油现在比纯柴油便宜,郭素沁促政府加速建设生物柴油储存库
  • BIODIESEL B20 KINI LEBIH MURAH DARIPADA DIESEL TULEN. KERAJAAN DIGESA MEMPERCEPATKAN NAIK TARAF DEPOT BAGI MEMPERLUAS PELAKSANAAN B20 UNTUK MENANGANI KENAIKAN HARGA BAHAN API.
  • BIODIESEL B20 IS CHEAPER THAN PURE DIESEL NOW. GOVERNMENT IS URGED TO FAST-TRACK CRITICAL DEPOT UPGRADES IN ORDER TO ACCELERATE B20 BIODIESEL ROLLOUT TO MITIGATE SURGING FUEL COSTS
  • 郭素沁促政府加速落实B20生物柴油政策;重启油库建设缓解燃油涨价压力
  • KERAJAAN DIGESA MEMPERCEPATKAN PELAKSANAAN BIODIESEL B20 DENGAN SEGERA MENGHIDUPKAN SEMULA PEMBINAAN DEPOT BAGI MENANGANI KRISIS HARGA BAHAN API
  • GOVERNMENT IS URGED TO ACCELERATE B20 BIODIESEL ROLLOUT BY URGENTLY REVIVING DEPOT CONSTRUCTION TO COUNTER FUEL PRICE CRISIS
  • 郭素沁:设立皇委会是检验昌明政府透明承诺的试金石
  • Press statement by Teresa Kok, MP for Seputeh on 12 March 2026: An RCI Is the Test of Madani’s Commitment to Transparency
  • KENYATAAN MEDIA OLEH TERESA KOK, AHLI PARLIMEN SEPUTEH (12 MAC 2026): RCI Adalah Ujian Komitmen Kerajaan Madani Terhadap Ketelusan
  • 郭素沁呼吁反贪会调查前经济部长助理蔡镇燊的方式 应避免陷“舆论公审”

Article Archives

© 2026 TERESAKOK | Powered by Minimalist Blog WordPress Theme